{"id":4539,"date":"2024-03-13T04:13:07","date_gmt":"2024-03-13T04:13:07","guid":{"rendered":"https:\/\/angar87.com.ua\/?post_type=poslugi&#038;p=4539"},"modified":"2026-10-29T11:51:54","modified_gmt":"2026-10-29T11:51:54","slug":"installation-disassembly","status":"publish","type":"poslugi","link":"https:\/\/angar87.com.ua\/en\/poslugi\/installation-disassembly\/","title":{"rendered":"Installation\/disassembly"},"content":{"rendered":"\n<h2 class=\"wp-block-heading has-text-align-center\">Installation and Dismantling<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>TAF-87 provides installation services for metal structures<\/strong>, including hangars, canopies, warehouses, garages, elevated platforms, pavilions, beams, and other structural elements.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Installation and Dismantling Prices<\/strong><\/h4>\n\n\n\n<figure class=\"wp-block-table is-style-stripes\"><table><tbody><tr><td>No.<\/td><td>Service<\/td><td class=\"has-text-align-center\" data-align=\"center\">Price<\/td><\/tr><tr><td>1<\/td><td>Construction and installation work<\/td><td class=\"has-text-align-center\" data-align=\"center\">Price on request<\/td><\/tr><tr><td>2<\/td><td>Dismantling work<\/td><td class=\"has-text-align-center\" data-align=\"center\">Price on request<\/td><\/tr><tr><td>3<\/td><td>Custom scope of work<\/td><td class=\"has-text-align-center\" data-align=\"center\">Price on request<\/td><\/tr><\/tbody><\/table><figcaption class=\"wp-element-caption\"><strong>For more information, please contact our sales department at <strong>+380 50 915 05 38<\/strong>.<\/strong><\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Metal Structure Installation Services<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Installation may include the following stages and services:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Planning and consultation:<\/strong> TAF-87 specialists carry out a preliminary site assessment and advise customers on suitable structural solutions, dimensions, and installation requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Site preparation:<\/strong> This may include foundation preparation, setting out, preparation of supporting elements, and other work required before erection begins.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Structural erection and assembly:<\/strong> TAF-87 specialists assemble and install the metal components according to the project documentation and the agreed installation procedure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Quality control and additional work:<\/strong> Completed work is inspected, components are adjusted where required, and additional tasks, such as insulation and cladding installation, are carried out.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Final inspections and handover:<\/strong> On completion, the required inspections and tests are performed, and the completed work is handed over to the customer.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Design Documentation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Where a complete design package is available, the hangar erection requirements are set out in the explanatory notes, architectural and structural drawings, and relevant installation documentation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Hangar Installation Stages<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Hangar installation typically includes the following activities. Their sequence must follow the project-specific erection plan, including any temporary bracing required to maintain stability.<\/p>\n\n\n\n<ol start=\"1\" class=\"wp-block-list\">\n<li><strong>Setting out:<\/strong> The building position is established relative to the site reference points. Foundation and column locations are marked, and dimensions, distances, diagonals, and levels are checked. Accurate setting out is essential because errors can be costly and time-consuming to correct.<\/li>\n\n\n\n<li><strong>Foundation and cast-in component construction:<\/strong> Foundations, anchor bolts, and other cast-in components are installed according to the design. Ground conditions, concrete properties, and weather conditions must be taken into account.<\/li>\n\n\n\n<li><strong>Column installation:<\/strong> Columns form the main vertical load-bearing elements. They are positioned, aligned, temporarily stabilized where required, and securely connected to the foundations and anchoring components.<\/li>\n\n\n\n<li><strong>Truss or beam installation:<\/strong> Roof trusses or beams are installed to carry the roof and the loads specified in the structural design, including applicable snow and rainwater loads.<\/li>\n\n\n\n<li><strong>Purlin installation:<\/strong> Roof purlins are installed to support the profiled metal sheeting or other specified roof covering.<\/li>\n\n\n\n<li><strong>Bracing installation:<\/strong> Diagonal bracing is installed in the sequence required by the erection plan to stabilize the frame and resist the forces specified in the design.<\/li>\n\n\n\n<li><strong>Wall rail installation:<\/strong> Wall rails and other secondary framing members are installed to support the wall cladding and transfer its loads to the main structure.<\/li>\n\n\n\n<li><strong>Gate and personnel door installation:<\/strong> Gates and personnel doors are installed where specified, at the appropriate stage of the works.<\/li>\n\n\n\n<li><strong>Protective coating application:<\/strong> Structural components receive the specified protective coatings. These may include GF-021 primer and PF-115 enamel where appropriate to the project. Coatings are applied before or after erection as specified, with damaged areas repaired as required.<\/li>\n\n\n\n<li><strong>Membrane installation:<\/strong> Roofing or wall membranes are installed where required by the building envelope design.<\/li>\n\n\n\n<li><strong>Roof cladding installation:<\/strong> Profiled metal roof sheets or other specified roofing materials are installed.<\/li>\n\n\n\n<li><strong>Wall cladding installation:<\/strong> Profiled metal wall sheets or other specified cladding materials are installed.<\/li>\n\n\n\n<li><strong>Flashing and trim installation:<\/strong> Flashings, trims, and closure components are installed around edges, joints, and openings.<\/li>\n\n\n\n<li><strong>Rainwater drainage installation:<\/strong> Gutters, downpipes, and other specified rainwater drainage components are installed.<\/li>\n\n\n\n<li><strong>Window and rooflight installation:<\/strong> Windows, rooflights, and other specified daylighting elements are installed.<\/li>\n\n\n\n<li><strong>Building services installation:<\/strong> The required utilities, engineering systems, and associated equipment are installed according to the project scope.<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">Dismantling<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A hangar can be dismantled either <strong>for reuse<\/strong> or <strong>without preserving its components for reuse<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The appropriate method depends on whether the structure is to be reassembled elsewhere or removed without retaining the components in their original condition.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Dismantling for Reuse<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">This method begins with a detailed inspection, photographic and video documentation, preparation of a layout drawing, and identification of components, connections, and assemblies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dismantling then proceeds in a planned sequence, generally reversing the erection process while maintaining structural stability throughout.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Building services are isolated and removed first, where present. Cladding and external components are then removed, including windows, doors, gates, and entrance canopies.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The frame is subsequently dismantled in the sequence specified by the dismantling plan. This includes wall rails, purlins, bracing, trusses or beams, and columns. Temporary supports or bracing are used where required.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Foundations are generally left in place unless their removal forms part of the agreed scope.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Dismantling Without Component Preservation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Where reuse is not required, components may be cut or separated rather than carefully unbolted and retained.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cladding is removed, and the steel frame may be cut using suitable equipment, including thermal cutting equipment where appropriate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The work follows a planned dismantling sequence, with services isolated and structural stability maintained until each component is safely removed.<\/p>\n","protected":false},"featured_media":3601,"template":"","class_list":["post-4539","poslugi","type-poslugi","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/angar87.com.ua\/en\/wp-json\/wp\/v2\/poslugi\/4539","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/angar87.com.ua\/en\/wp-json\/wp\/v2\/poslugi"}],"about":[{"href":"https:\/\/angar87.com.ua\/en\/wp-json\/wp\/v2\/types\/poslugi"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/angar87.com.ua\/en\/wp-json\/wp\/v2\/media\/3601"}],"wp:attachment":[{"href":"https:\/\/angar87.com.ua\/en\/wp-json\/wp\/v2\/media?parent=4539"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}