Address

Kharkiv, str. Dobrovoltsiv (Molodoy Gvardii), 15/17, 4th floor, room 408

Designing

Designing

Design is the process of developing concepts, plans, drawings, specifications and other documents that are necessary for the implementation of any object or system. This process can include different stages, depending on the type of project and its scope.

Price for design services:

NamePrice
1technical documentationcontractual
For detailed information, contact the sales department at 050 915 05 38

The design of TAF-87 hangars and metal structures is a complex process that includes a number of stages and actions. Here is a general overview of the steps typically involved in this process:

  1. Collection of raw data: This includes obtaining information about building dimensions, purpose, geographical location, loads, structural requirements, etc.
  2. Planning and design: At this stage, the general concept of the building is developed, including its dimensions, configuration, interior arrangement of rooms, windows, doors, ventilation and other details.
  3. Selection of the type of metal structures: It is determined which type of metal structures best meets the needs of the project. It can be a strip foundation, a frame structure, an arched structure, etc.
  4. Calculation of loads: Calculation of loads is carried out, including static (building weight, snow, wind, etc.) and dynamic loads (moving objects, people, equipment, etc.).
  5. Development of structural solutions: Based on calculations and requirements, structural solutions are determined, including the choice of materials, profile sizes, type of connections, etc.
  6. Development of design documentation: After development of design solutions, corresponding design drawings and specifications are created.
  7. Performance of technical calculations: Technical calculations are carried out to check the strength, stability and safety of metal structures.
  8. Cost estimation: The cost of materials and works for the construction of the building is determined.
  9. Selection of contractor TAF-87: Contractor for construction.
  10. Construction and control: The construction of the building is carried out by TAF-87 specialists in compliance with all project decisions and standards, and the quality of work is also monitored.