When planning and constructing a hangar, consider the following:
Legal and regulatory requirements: Does the proposed structure comply with the applicable requirements? Could its construction or use interfere with neighbouring properties or infringe the rights of third parties?
Commissioning: Will the hangar require formal commissioning, and who will be responsible for completing the necessary procedures?
Vehicle access: How will vehicles access the site during construction and after completion?
Design documentation: Will the work follow properly prepared drawings and specifications, rather than informal instructions or assumptions?
Snow loads: Does the design account for the applicable snow loads, including drifting, localized accumulation, and exceptional snow conditions where required?
Wind loads: Does the design account for wind pressure, suction, and local effects associated with the building’s shape and surroundings?
Drainage: How will rainwater and snowmelt be collected and directed away from the roof, foundations, and surrounding site?
Natural lighting: Is daylight required inside the hangar? If so, how will windows, rooflights, or other daylighting elements be incorporated?
Structural fabrication: Who will manufacture the structural components, and how will their quality be checked?
Contractor capabilities: Does the main contractor have the experience, equipment, resources, and qualified personnel needed to complete the work?
Project schedule: What completion date is proposed, and what timeframe is acceptable to the customer?
Future development: Are additional buildings or extensions planned, and how might they affect the hangar’s location, access, and operation?
Handover documentation: Which drawings, certificates, instructions, and other agreed documents will be provided when the completed hangar is handed over?
Construction site housekeeping: Who will be responsible for keeping the site tidy during construction and removing waste and debris after completion?
Cleaning the completed structure: How will the finished structure be cleaned before handover, and what access or arrangements will be needed for subsequent cleaning?